Mobility Management
Transport Planning
Traffic Engineering
Mobility Research
Surveys
Quality Measurement
Dialogue
Public Transport
Public Space
Operation
As INGE Plärrer – Dorsch, the companies of the Dorsch Group (PB CONSULT, GRE German Rail Engineering and KREBS + KIEFER) together with two renowned Nuremberg architectural offices (wgf Landschaftsarchitekten and Bermüller+Niemeyer Architekten) have been awarded the contract for the general planning services for the redesign of the Plärrer according to the framework plan undertaken by the City of Nuremberg in advance.
The Plärrer is one of the main traffic junctions in Nuremberg, which borders directly on Nuremberg’s Old Town and is of great importance for all public and individual transport users (3 underground lines, 2 tram lines and 2 bus lines). In the course of the redesign, the traffic facilities (road and rail | tram incl. catenary) will be restructured. The underground structure under the square will be repaired and adapted to the new conditions. In addition to the redesign of the traffic facilities and the underground structure, square-designing high-rise buildings will be created and an additional 100 trees will be planted (in addition to the existing trees).
The various tasks are distributed within INGE Plärrer – Dorsch as follows:
The construction period will extend from September 2023 to October 2028.