Mobility Management
Transport Planning
Traffic Engineering
Mobility Research
Surveys
Quality Measurement
Dialogue
Public Transport
Public Space
Operation
In order to adhere to the adjusted guidelines regarding the removal of fire loads, PB CONSULT was commissioned with the completion of several sections within the scope of the fire protection measures for the Nuremberg/Fuerth underground train facilities. Tasks to be completed include: The installation of the fire mains in Langwasser Nord underground station, the documentation of fire-retarding sealings in 38 underground constructions and repair of damaged facilities, the strengthening of building joints in the fire protection classification A1 and renovation of the joints next to the escalators.
In addition to the basic evaluation and the survey, PB CONSULT creates the tender and plan documentation and oversees the execution of the works (construction supervision). Approximately 5,100 m construction joints and 3,300 m joints next to the escalators were examined and put out for tender, and approximately 10,000 firewalls were tested, 4,000 of which require repair.
Stadt Nürnberg
VAG Verkehrs-Aktiengesellschaft Nürnberg
Your consent
We only use cookies that are technically necessary. In addition, we would like to show content from external platforms such as LinkedIn directly on this page. Doing so transfers data to those providers, including your IP address. You decide whether this happens. You can change your selection at any time under Settings.
Cookie settings
Diese Einträge sind für den Betrieb der Website technisch erforderlich. Sie sichern Formulare gegen Missbrauch ab, merken die gewählte Sprache und speichern Ihre Cookie-Auswahl. Ohne sie funktioniert die Website nicht.
Website-Basisfunktionen
Cookie-Einwilligung
Anzeige-Einstellungen
Zeigt Inhalte von externen Plattformen direkt auf dieser Website an, zum Beispiel unsere LinkedIn-Beiträge. Dabei werden Daten an die jeweiligen Anbieter übertragen, unter anderem Ihre IP-Adresse.
Elfsight